Q: How long does a full yard line replacement take?
A: Typically 1–2 days. We aim to have your water back on the same evening.
Q: Will you ruin my landscaping?
A: We treat your yard with respect. We lay down plywood to protect grass from heavy equipment and hand-dig around sensitive flower beds.
Q: Why install Dual Cleanouts?
A: Code requires them, but they also save you money later. They allow a snake to go both ways (toward the street and toward the house) without removing a toilet.



